IBM Support

PH44149: FPA ANALYZE JOB ABENDS WITH U3010 BECAUSE OPEN FAIL OF HFPSNNNN DD DATA SETS OCCUR

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Intermittently the FPA ANALYZE job will end with ABENDU3010
    due to an open failure of the HFPSnnnn DD data sets.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All users of HPFPU Fast Path Advanced Tool   *
    *                 in Fast Path Solution Pack Version 2         *
    *                 Release 1 (FMID: HAHQ210).                   *
    ****************************************************************
    * PROBLEM DESCRIPTION: Intermittently the FPA ANALYZE jobs     *
    *                      abended with U3010 or S0C4, or          *
    *                      incorrectly reported pointer errors or  *
    *                      key sequence errors.                    *
    ****************************************************************
    * RECOMMENDATION: Apply the maintenance for this APAR.         *
    ****************************************************************
    The FPA ANALYZE function may incorrectly assign the same DDNAMEs
    to the intermediate work data sets for different areas that are
    being processed parallelly, which results in different error
    symptoms.
    The FPA ANALYZE function doesn't clear the work area that is
    used to store the RAP RBAs, when the areas are not processed in
    ascending order, FPA ANALYZE function may incorrectly report key
    sequence error.
    

Problem conclusion

  • The FPA ANALYZE function has been changed to assign the DDNAMEs
    to the intermediate work data sets correctly, and clear the
    work area for the RAP RBAs when it starts to process a new area.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PH44149

  • Reported component name

    IMS FP SOLUTION

  • Reported component ID

    5655W1400

  • Reported release

    210

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2022-02-14

  • Closed date

    2022-05-25

  • Last modified date

    2022-06-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UI80687

Modules/Macros

  • HFPAINI0 HFPCFNS0 HFPFATI0 HFPFTTS0 HFPTKEY0
    

Fix information

  • Fixed component name

    IMS FP SOLUTION

  • Fixed component ID

    5655W1400

Applicable component levels

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCV35A","label":"IMS Tools"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"210"}]

Document Information

Modified date:
06 July 2022