IBM Support

PH42965: ETT ISSUE: HOLD/RELEASE NOT WORKING WHEN PREDECESSOR ABENDS

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Issue encountered when the 2nd instance of the ETT occurrence
    has an external PRED with itself but it PRED was abended, and
    the abend job was manually set to complete.
    The HOLD/RELEASE for the job in the 2nd instance of
    the ETT were not being released.
    .
    i.e.
    The application exists of 2 jobs, the first one the hold/release
    the second job is forced in abend with an abend step.
    After marking the abended job as complete, the sucessor job was
    not automaticall released.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All IBM WS  for z/OS  930 and                *
    *                 IBM Z WS 950 users.                          *
    *                 Function=MCP                                 *
    ****************************************************************
    * PROBLEM DESCRIPTION: An operation of an ETT occurrence       *
    *                      remains in ready status even if all the *
    *                      predecessors are completed.             *
    ****************************************************************
    The first operation of an occurrence, added via ETT defined
    with job replacement to Y, remains in ready status even if all
    the predecessors are completed.
    

Problem conclusion

  • The ETT operation is now released correctly
    

Temporary fix

Comments

APAR Information

  • APAR number

    PH42965

  • Reported component name

    TIV WRKLD SCHD

  • Reported component ID

    5697WSZ01

  • Reported release

    950

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-12-21

  • Closed date

    2022-05-19

  • Last modified date

    2022-06-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UI80581 UI80582

Modules/Macros

  • EQQMC3CH
    

Fix information

  • Fixed component name

    TIV WRKLD SCHD

  • Fixed component ID

    5697WSZ01

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRULV","label":"IBM Workload Scheduler for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"950","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]

Document Information

Modified date:
06 July 2022