Direct links to fixes
APAR status
Closed as program error.
Error description
Instance migration in IBM Business Process Manager (BPM) V8.5.6.0 cumulative fix 2 is significantly slower than previous releases.
Local fix
Problem summary
When you migrate process instances in IBM BPM V8.5.6.0 cumulative fix 2, the throughput performance is significantly slower compared to IBM BPM V8.5.6.0 and IBM BPM V8.5.6.0 cumulative fix 1.
Problem conclusion
A fix will be incorporated into a later release that improves instance migration performance and also reduces the memory footprint in the system when migrating instances.
Temporary fix
Comments
APAR Information
APAR number
JR55587
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
856
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2016-03-21
Closed date
2016-05-02
Last modified date
2016-05-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R857 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"856","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
02 May 2016