Direct links to fixes
APAR status
Closed as program error.
Error description
In IBM Business Process Manager (BPM) V7.5.1.2, if you select the date format dd/MM/yyyy in a locale other than English and then migrate the snapshot to IBM BPM V8.5.6 the dates display in the MM/dd/yyyy format instead. PRODUCTS AFFECTED IBM Business Process Manager (BPM) Advanced IBM BPM Standard IBM BPM Express
Local fix
In IBM BPM V8.5.6, use the Override locale option in IBM Process Designer and select the date format you want.
Problem summary
No additional information is available.
Problem conclusion
A fix is currently targeted for inclusion in an upcoming cumulative fix on IBM BPM V8.5.6.0 that correctly displays the locale format of dates when you run heritage coaches from IBM BPM V7.5.1.2.
Temporary fix
Comments
APAR Information
APAR number
JR55364
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
856
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2016-02-19
Closed date
2016-03-10
Last modified date
2016-03-10
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R856 PSY
UP
R857 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"856","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
10 March 2016