Fixes are available
APAR status
Closed as program error.
Error description
While you're trying to shut down the server, the server's JVM might wait for a long time for all threads to complete. This wait prevents Java processes from ending.
Local fix
Problem summary
The variable controlling the start and end of a thread is not properly synchronized. In rare situations, two finishing threads are counted as one.
Problem conclusion
A fix is available for IBM BPM V8.0.1.3 that properly synchronizes the accesses to that variable and, therefore, speeds the time required to shut the server down. On Fix Central (http://www.ibm.com/support/fixcentral), search for JR54396: 1. Select IBM Business Process Manager with your edition from the product selector, the installed version to the fix pack level, and your platform, and then click Continue. 2. Select APAR or SPR, enter JR54396, and click Continue. When you download fix packages, ensure that you also download the readme file for each fix. Review each readme file for additional installation instructions and information about the fix.
Temporary fix
Not applicable
Comments
APAR Information
APAR number
JR54396
Reported component name
BPM STANDARD
Reported component ID
5725C9500
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-09-29
Closed date
2015-11-27
Last modified date
2015-11-27
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM STANDARD
Fixed component ID
5725C9500
Applicable component levels
R801 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTDH","label":"IBM Business Process Manager Standard"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
14 October 2021