Direct links to fixes
APAR status
Closed as program error.
Error description
When you migrate a double deployment environment setup with LDAP configured from IBM Business Process Manager (BPM) V8.0.1.x to IBM BPM V8.5.6, the LDAP realm base entry is duplicated in the migration target environment. PRODUCTS AFFECTED IBM BPM Advanced IBM BPM Standard IBM BPM Express
Local fix
N/A
Problem summary
The IBM BPM configuration code does not check whether the LDAP realm base entry already exists when configuring the second deployment environment in the migration target setup.
Problem conclusion
A fix is included in IBM BPM V8.5.6.0 Cumulative Fix 1 that checks whether an LDAP realm base entry already exists before adding it. To get this cumulative fix, go to http://www.ibm.com/support/docview.wss?uid=swg27046290.
Temporary fix
Comments
APAR Information
APAR number
JR54314
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
856
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-09-16
Closed date
2015-11-30
Last modified date
2015-11-30
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R856 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"856","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
14 October 2021