A fix is available
APAR status
Closed as program error.
Error description
In IBM Process Portal, if one coach is called from another coach in a new window by using the JavaScript window.open() function, the invoking (parent) coach is refreshed and the newly entered data is lost. PRODUCTS AFFECTED IBM BPM Advanced IBM BPM Standard IBM BPM Express
Local fix
Problem summary
No additional information is available.
Problem conclusion
A fix for IBM BPM V8.0.1.2 and V8.5.0.1 is available that ensures the window in which a task completion user interface is launched is not reloaded unless you are using SharePoint integration (where the reload is required). On Fix Central (http://www.ibm.com/support/fixcentral), search for JR49949: 1. Select IBM Business Process Manager with your edition from the product selector, the installed version to the fix pack level, and your platform, and then click Continue. 2. Select APAR or SPR, enter JR49949, and click Continue. When you download fix packages, ensure that you also download the readme file for each fix. Review each readme file for additional installation instructions and information about the fix.
Temporary fix
Comments
APAR Information
APAR number
JR53312
Reported component name
BPM STANDARD
Reported component ID
5725C9500
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-05-13
Closed date
2015-07-14
Last modified date
2015-07-14
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM STANDARD
Fixed component ID
5725C9500
Applicable component levels
R801 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTDH","label":"IBM Business Process Manager Standard"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
16 October 2021