Direct links to fixes
APAR status
Closed as program error.
Error description
When you upgrade a deployment environment to IBM Business Process Manager (BPM) V8.5.6.0, but the WebSphere CellDefaultKeyStore or NodeDefaultKeyStore was deleted, the profile upgrade stops with an error similar to the following error: CWMCB0046E: The 'createSSLConfig' command failed: The keyStores name NodeDefaultKeyStore and scopeName (cell):PSCell1:(node):Node1 is not found
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: IBM BPM Advanced * * IBM BPM Standard * * IBM BPM Express * **************************************************************** * PROBLEM DESCRIPTION: When you upgrade a deployment * * environment to IBM Business Process * * Manager (BPM) V8.5.6.0, but the * * WebSphere CellDefaultKeyStore or * * NodeDefaultKeyStore was deleted, the * * profile upgrade stops with an error * * similar to the following error: * * CWMCB0046E: The 'createSSLConfig' * * command failed: The keyStores name * * NodeDefaultKeyStore and scopeName * * (cell):PSCell1:(node):Node1 is not * * found * **************************************************************** * RECOMMENDATION: * **************************************************************** As part of upgrading the IBM BPM deployment environment to V8.5.6.0, a keystore and SSL configuration for Blueworks Live and a keystore to encrypt business objects are added to the configuration. Both keystores use the same password as the WebSphere CellDefaultKeyStore initially, and the SSL configuration refers to the NodeDefaultKeyStore. If the CellDefaultKeyStore or the NodeDefaultKeyStore were been deleted, you receive the error.
Problem conclusion
A fix is available for IBM BPM V8.5.6.0 that allows the Blueworks Live keystore and SSL configuration and the keystore for business object encryption to be created successfully if when the CellDefaultKeyStore or the NodeDefaultKeyStore were deleted. On Fix Central (http://www.ibm.com/support/fixcentral), search for JR53044: 1. Select IBM Business Process Manager with your edition from the product selector, the installed version to the fix pack level, and your platform, and then click Continue. 2. Select APAR or SPR, enter JR53044, and click Continue. When you download fix packages, ensure that you also download the readme file for each fix. Review each readme file for additional installation instructions and information about the fix.
Temporary fix
Comments
APAR Information
APAR number
JR53044
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
856
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-04-07
Closed date
2015-05-24
Last modified date
2015-06-09
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R800 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"856","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
16 October 2021