IBM Support

JR52533: COMPLETED BPD INSTANCES WITH TASKS IN STATUS RECEIVED

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • If you are using activities that have interrupting events
    attached, you might occasionally observe completed business
    process definition (BPD) instances that are closed yet contain
    active tasks marked RECEIVED.
    

Local fix

  • In the Process Inspector, in IBM Process Designer, use REST or
    JavaScript APIs to manually resume the instance. The open task
    automatically completes.
    

Problem summary

  • The problem occurs, when two actions run at the same time:
    
    - The implementation of the activity is running
    - The attached interrupting event uses the message
    
    Both actions read, modify, and save the task. In such a
    situation, the outcome depends on the exact timing: sometimes,
    the correct CLOSED status is replaced by an incorrect RECEIVED
    status.
    

Problem conclusion

  • A fix is/will be available for IBM BPM V8.0.1.2 that locks the
    task before modifying it.
    
    On Fix Central (http://www.ibm.com/support/fixcentral), search
    for JR52533:
    
    1. Select IBM Business Process Manager with your edition from
      the product selector, the installed version to the fix pack
      level, and your platform, and then click Continue.
    
    2. Select APAR or SPR, enter JR52533, and click Continue.
    
    When you download fix packages, ensure that you also download
    the readme file for each fix. Review each readme file for
    additional installation instructions and information about the
    fix.
    

Temporary fix

  • Not applicable
    

Comments

APAR Information

  • APAR number

    JR52533

  • Reported component name

    BPM STANDARD

  • Reported component ID

    5725C9500

  • Reported release

    801

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-02-09

  • Closed date

    2015-04-09

  • Last modified date

    2015-04-09

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM STANDARD

  • Fixed component ID

    5725C9500

Applicable component levels

  • R801 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTDH","label":"IBM Business Process Manager Standard"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Edition":"","Line of Business":{"code":"LOB36","label":"IBM Automation"}}]

Document Information

Modified date:
09 April 2015