Direct links to fixes
APAR status
Closed as program error.
Error description
When you run IBM Process Portal in Internet Explorer 10, heritage coaches do not load correctly. PRODUCTS AFFECTED IBM Business Process Manager (BPM) Advanced IBM BPM Standard IBM BPM Express
Local fix
Problem summary
Internet Explorer 5 Quirks mode is the document mode required for heritage coaches to load properly in Internet Explorer 10. This mode cannot be used in the same browser window in which Process Portal runs.
Problem conclusion
A fix is available for IBM BPM V8.0.1.2, V8.5.0.1, and V8.5.5.0 that adds a new property, launch-in-new-window-enabled, that, when set to true, forces a coach to be loaded in a new browser window. This coach must be for a task selected from the task list on the Work tab, a dashboard selected from the Dashboards tab menu, or a process or human service selected from the Launch tab in the right pane. On Fix Central (http://www.ibm.com/support/fixcentral), search for JR50481: 1. Select IBM Business Process Manager with your edition from the product selector, the installed version to the fix pack level, and your platform, and then click Continue. 2. Select APAR or SPR, enter JR50481, and click Continue. When you download fix packages, ensure that you also download the readme file for each fix. Review each readme file for additional installation instructions and information about the fix.
Temporary fix
Not applicable
Comments
APAR Information
APAR number
JR50481
Reported component name
BPM STANDARD
Reported component ID
5725C9500
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-06-11
Closed date
2015-02-19
Last modified date
2015-08-07
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM STANDARD
Fixed component ID
5725C9500
Applicable component levels
R801 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTDH","label":"IBM Business Process Manager Standard"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
14 October 2021