APAR status
Closed as program error.
Error description
The number of monitoring events emitted from IBM Business Process Manager (BPM) for consumption by IBM Business Monitor is not configurable. When running a business process definition (BPD), you can choose to emit all monitoring events for the BPD or no monitoring events. It is not possible to choose specific events to emit. In a situation where all monitoring events are emitted, more events than desired might be sent to IBM Business Monitor. For example, if all business data is specified in intermediate tracking events, other events such as PROCESS_STARTED and ACTIVTY_READY are still emitted. AFFECTED PRODUCTS: IBM Business Process Manager (BPM) Advanced IBM BPM Standard IBM BPM Express
Local fix
Problem summary
IBM BPM does not provide the capability to configure the number of monitoring events that are emitted for consumption by IBM Business Monitor.
Problem conclusion
A fix is available for IBM BPM 8.0.1.1. The fix includes a new application that provides configuration options to control which monitoring events are emitted from a BPD. On Fix Central (http://www.ibm.com/support/fixcentral), search for JR49092: 1. Select IBM Business Process Manager with your edition from the product selector, the installed version to the fix pack level, and your platform, and then click Continue. 2. Select APAR or SPR, enter JR49092, and click Continue. When you download fix packages, ensure that you also download the readme file for each fix. Review each readme file for additional installation instructions and information about the fix.
Temporary fix
Not applicable
Comments
APAR Information
APAR number
JR49092
Reported component name
BPM STANDARD
Reported component ID
5725C9500
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-01-17
Closed date
2014-04-17
Last modified date
2014-04-17
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM STANDARD
Fixed component ID
5725C9500
Applicable component levels
R801 PSY
UP
[{"Line of Business":{"code":"LOB45","label":"Automation"},"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTDH","label":"IBM Business Process Manager Standard"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1"}]
Document Information
Modified date:
07 October 2021