IBM Support

JR47159: PD PLAYBACK RESULTS IN REDEPLOYMENT WHEN ORPHAN AIS ASSETS ARE LEFT

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • If a Process Application (PA) or Toolkit (TK) is opened in
    IID, default Library and Implementation projects are created.
    The library project will be populated with artifacts mirroring
    those in the Process Application or Toolkit i.e. XSDs for BOs
    and WSDLs for BPD interfaces.
    
    Since the artifacts are mirrored any change to a BO or BPD
    interface will require that the advanced content BLA be
    redeployed. This will occur even if there is just a mirrored
    library with no references to it in a module. Redeploys can
    occur during a playback on Process Center if it is modified.
    
    Note: This does not affect cases where the library is referenced
    by a module even if that module is empty. They would still
    behave the same and trigger deploys when library artifacts are
    changed in Process Designer or Integration Designer.
    

Local fix

  • ---
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  IBM Business Process Manager Adv user.      *
    ****************************************************************
    * PROBLEM DESCRIPTION: PD Playback results in what seems to    *
    *                      be unnecessary re-deployment of AIS     *
    *                      modules (ears).                         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    ProcessDesigner playback results in redeployment when orphan
    Advanced Integration Services (AIS) assets are left after
    moving or deleting an AIS parent asset.
    

Problem conclusion

  • The optimization detects the situation described above and
    prevents the unnecessary re-deployment.
    
    Install/Dependency information is available in the readme.txt
    on FixCentral. When the user goes to the download files page
    in FixCentral, the readme will be available with the fix
    package as a separate download.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR47159

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    801

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-07-05

  • Closed date

    2013-08-26

  • Last modified date

    2014-05-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R800 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
07 January 2022