Fixes are available
APAR status
Closed as program error.
Error description
If a Process Application (PA) or Toolkit (TK) is opened in IID, default Library and Implementation projects are created. The library project will be populated with artifacts mirroring those in the Process Application or Toolkit i.e. XSDs for BOs and WSDLs for BPD interfaces. Since the artifacts are mirrored any change to a BO or BPD interface will require that the advanced content BLA be redeployed. This will occur even if there is just a mirrored library with no references to it in a module. Redeploys can occur during a playback on Process Center if it is modified. Note: This does not affect cases where the library is referenced by a module even if that module is empty. They would still behave the same and trigger deploys when library artifacts are changed in Process Designer or Integration Designer.
Local fix
---
Problem summary
**************************************************************** * USERS AFFECTED: IBM Business Process Manager Adv user. * **************************************************************** * PROBLEM DESCRIPTION: PD Playback results in what seems to * * be unnecessary re-deployment of AIS * * modules (ears). * **************************************************************** * RECOMMENDATION: * **************************************************************** ProcessDesigner playback results in redeployment when orphan Advanced Integration Services (AIS) assets are left after moving or deleting an AIS parent asset.
Problem conclusion
The optimization detects the situation described above and prevents the unnecessary re-deployment. Install/Dependency information is available in the readme.txt on FixCentral. When the user goes to the download files page in FixCentral, the readme will be available with the fix package as a separate download.
Temporary fix
Comments
APAR Information
APAR number
JR47159
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-07-05
Closed date
2013-08-26
Last modified date
2014-05-01
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R800 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
07 January 2022