APAR status
Closed as program error.
Error description
In Process Portal, you can display the process diagram for a task from a list of tasks by selecting Process Diagram from the drop-down list of actions for the task. On the process diagram that is displayed, clicking the task (which will be highlighted on the diagram) displays a list of experts (in a popup window) who have worked on similar tasks. If this list is larger than what can be displayed inside the popup, however, the display extends beyond the bottom edge of the popup and overlays the process diagram. A vertical scrollbar should be displayed in the popup, instead, to allow the user to scroll down to see the full list of users.
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: Users of BPM Express, BPM Standard and BPM * * Advanced. * **************************************************************** * PROBLEM DESCRIPTION: In Process Portal, you can display * * the process diagram for a task from a * * list of tasks by selecting Process * * Diagram from the drop-down list of * * actions for the task. On the process * * diagram that is displayed, clicking * * the task (which will be highlighted * * on the diagram) displays a list of * * experts (in a popup window) who have * * worked on similar tasks. If this * * list is larger than what can be * * displayed inside the popup, however, * * the display extends beyond the bottom * * edge of the popup and overlays the * * process diagram. A vertical * * scrollbar should be displayed in * * the popup, instead, to allow the user * * to scroll down to see the full list of * * users. * **************************************************************** * RECOMMENDATION: * **************************************************************** If there are more than 6 experts to be displayed for a task, the display overflows the bottom edge of the popup because there is no vertical scrollbar implemented in the popup.
Problem conclusion
In ActivityDetailsTooltip.js (JavaScript file responsible for displaying the popup), a vertical scrollbar has been added to display the popup correctly when there are more than 6 experts for a task. An interim fix for Business Process Manager Version 8.0.1.0 has been published to Fix Central. Please refer to the separate file that is automatically downloaded with the interim fix for prerequisite information and installation/uninstallation instructions.
Temporary fix
Comments
APAR Information
APAR number
JR46671
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-05-15
Closed date
2013-06-27
Last modified date
2013-06-27
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R800 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
08 January 2022