IBM Support

JR46247: COST AND LABOR COST KPIs ARE NOT CALCULATED DURING SIMULATIONS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When using Business Process Manager version 8.0.1, Optimizer
    simulation calculations for the Cost and Labor Cost KPIs are not
     working as expected.  Changing the participant from "All Users"
     to a specific user group in a Process Application makes no
    difference; the Cost and Labor Cost KPIs are still not
    calculated.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  Users of BPM Express, BPM Standard, and     *
    *                  BPM Advanced.                               *
    ****************************************************************
    * PROBLEM DESCRIPTION: When running a simulation using the     *
    *                      Optimizer, values are not calculated    *
    *                      for the Cost and Labor Cost KPIs.  If   *
    *                      non-zero KPI values are specified in    *
    *                      Process Designer when running a         *
    *                      simulation, then the Cost and Labor     *
    *                      Cost KPIs still report values of zero   *
    *                      after running the simulation.           *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    Logic to set values for the Cost and Labor Cost KPIs was
    incorrectly removed.
    

Problem conclusion

  • Logic to set values for the Cost and Labor Cost KPIs has been
    restored.
    
    A Business Process Manager version 8.0.1.0 interim fix for
    JR46247 is available from Fix Central.  Fix application
    instructions are also available when obtaining the interim fix
    from Fix Central.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR46247

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    801

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-04-04

  • Closed date

    2013-07-16

  • Last modified date

    2013-07-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R800 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
07 January 2022