A fix is available
APAR status
Closed as fixed if next.
Error description
After change cost value in "Participant Group Override", simulation result did not reflect the new cost settings.
Local fix
N/A
Problem summary
Fix delivery planned for next V8 release, targetting 4Q2012. USER AFFECTED: Users of IBM Business Process Manager Optimizer who are creating simulation analysis scenarios using Participant Group Overrides. PROBLEM SUMMARY: When creating a Simulation Analysis Scenario in IBM Business Process Manager, Participant Group Overrides values are not used. PROBLEM DETAILED DESCRIPTION: The Simulation Analysis Scenario editor contains a section for adding Participant Group Overrides values. If present, these values should be used by the Simulation engine instead of the original corresponding Participant Group values. However, the Simulation engine incorrectly ignores these overrides and uses the original Participant Group values. PROBLEM CONCLUSION: This defect fixes the problem so the Particpant Group Overrides values are used as expected.
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
JR43307
Reported component name
BPM STANDARD
Reported component ID
5725C9500
Reported release
800
Status
CLOSED FIN
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-07-04
Closed date
2012-09-12
Last modified date
2012-09-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
R800 PSY
UP
[{"Line of Business":{"code":"LOB45","label":"Automation"},"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTDH","label":"IBM Business Process Manager Standard"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0"}]
Document Information
Modified date:
07 October 2021