Error description

  • The recommendation for naming of environment variables had
    been to use dot separated names (com.principal.servers.smtp.name
    for example). This worked very well with command line completion
    in the javascript editor when using the tw.env namespace. The
    7.5.1 version does not allow you to enter names with dots. This
    conflicts with the previous guidance. Also, many of the IBM
    provided toolkits make use of the dot separated naming standard.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  WebSphere BPM 7.5.1 Express, Standard and   *
    *                  Advanced Users                              *
    ****************************************************************
    * PROBLEM DESCRIPTION: In Process Designer, a Process          *
    *                      Application Environment                 *
    *                      Variable Editor does                    *
    *                      not allow you to enter environment      *
    *                      variable names with dots.               *
    *                      This conflicts with the previous        *
    *                      guidance.                               *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    In Process Designer, a Process
    Application Environment
    Variable Editor does
    not allow you to enter environment
    variable names with dots. This was a regression over previous
    versions of the product where the same was allowed.
    

Problem conclusion

  • The regression was fixed via IFIX JR42012.
    The iFix has been published in Fix Central.
    
    The fix is available as a part of the JR42012 ifix package
    (http://www-01.ibm.com/support/docview.wss?uid=swg1JR42012)
    and needs to be installed as follows:
    - Install JR42012 on both Process Designer and Process
    Center/Server using IM
    - On Process Center/Server run bpmprofileUpgrade as outlined in
    http://www-01.ibm.com/support/docview.wss?uid=swg27022245#recove
    rFailure
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR41658

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    750

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2012-01-12

  • Closed date

    2012-02-22

  • Last modified date

    2012-04-23

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R750 PSY

       UP

  • R751 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
23 April 2012