APAR status
Closed as requirement.
Error description
Problem compiling jobs on IS 8.01 FP1 on Red Hat Enterprise Linux ES release 4 (Nahant Update 5). Jobs take loog long and sometimes fails to compile. Similar issue has been raised in e-case 129609.
Local fix
Workaround is to switch off the optimization (-O flag) This fix is included in 8.0.1 fixpack 3
Problem summary
Problem conclusion
Temporary fix
Comments
Closing the APAR. This enhancement will be considered for a future release.
APAR Information
APAR number
JR29081
Reported component name
WIS DATASTAGE
Reported component ID
5724Q36DS
Reported release
801
Status
CLOSED REQ
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2008-04-22
Closed date
2009-01-12
Last modified date
2010-12-09
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSVSEF","label":"IBM InfoSphere DataStage"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
09 December 2010