IBM Support

IV98549: UPDATE DOCUMENTATION FOR THE RECOVERY PLAN.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as documentation error.

Error description

  • Into the following documentation for recovery plan :
    
    https://www.ibm.com/support/knowledgecenter/en/SSGSPN_9.3.0/com.
    ibm.tivoli.itws.doc_9.3/distr/src_tr/awstrrecwithplanman.htm
    
    
    https://www.ibm.com/support/knowledgecenter/en/SSGSPN_9.3.0/com.
    ibm.tivo li.itws.doc_9.3/distr/src_tr/awstrcorrsymprecov.htm
    
    Add the following limitation/side effect.
    
    1. Some Tivoli Workload Scheduler events that were triggered
    before applying the recovery procedure, might be triggered
    again after the recovery procedure has completed. This
    limitation concerns those events that are not managed through a
    message queue, for example, UNTIL, DEADLINE, and MAXDUR.
    
    2. Jobs in USERJOBS Job Stream are not subjected to Resource
    controlling. Affected Resources should be correspondently
    adjusted and attended manually.
    
    3. Prompts in the recovered plan might have a prompt number
    different from the prompt number in the original plan. To avoid
    a mismatch, prompt reply events are not recovered.
    

Local fix

Problem summary

  •  see apar description
    

Problem conclusion

  •  This apar will be included into TWS 9.4 FP2
    and 9.X readmes.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IV98549

  • Reported component name

    TIV WKLD SCHDL

  • Reported component ID

    5698WKB86

  • Reported release

    8A6

  • Status

    CLOSED DOC

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2017-08-02

  • Closed date

    2017-10-23

  • Last modified date

    2017-10-23

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSGSPN","label":"IBM Workload Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8A6","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
23 October 2017