APAR status
Closed as program error.
Error description
While ccr is disabled customer ran following command which led to ccr error: root> mmchnode --daemon-interface=<node> -N <node> Fri Mar 3 15:01:50 CET 2017: mmchnode: Processing node <node> Verifying GPFS is stopped on all nodes ... ccrio initialization failed (err 811) mmchnode: Unable to delete the SMB config file from CCR. (RC 149) mmchnode: Propagating the cluster configuration data to all affected nodes. This is an asynchronous process. mmchnode: Command failed. Examine previous error messages to determine cause.
Local fix
Problem summary
A CCR initialization issue comes up when changing the daemon interface.
Problem conclusion
An internal check is added if CCR is declared as active in the configuration before trying to access it
Temporary fix
Comments
APAR Information
APAR number
IV94996
Reported component name
SPECTRUM SCALE
Reported component ID
5725Q01AP
Reported release
423
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-04-11
Closed date
2017-04-11
Last modified date
2019-06-28
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
SPECTRUM SCALE
Fixed component ID
5725Q01AP
Applicable component levels
R423 PSY U885025
19/06/28 I 1000
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"STXKQY","label":"IBM Spectrum Scale"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"423","Edition":"","Line of Business":{"code":"LOB26","label":"Storage"}},{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSFKCN","label":"General Parallel File System"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"423","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
28 June 2019