Error description

  • When a foreign currency receipt is returned the currency line
    cost of the receipt and return doesn't match.
    The exchange rate indicated on both the receipt and the return
    is the same so, it would be expected that the currency line cost
    would match after it was calculated using the same exchange
    rate.
    
    Steps to recreate:
    1. Create a PO with US vendor.
    2. Add Material line.
    3. Changes status to APPR.
    4. Receive the line - Note the exchange rate and line cost in
    USD:
    5. Wait until the next day when a different Exchange rate is
    entered.
    6. Return the line - Note the difference with the USD line total
    using the same exchange rate:
    Note the exchange rate indicated on the return transaction. It
    is same as on the receipt but the currency unit cost and
    currency line cost on the return doesn't match receipt.
    If the return is actually using the same exchange rate
    to convert the actual line cost (in CAD) to
    the currency line cost, the return currency line cost should
    match the receipt's currency line cost but it doesn't.
    It appears that the return is actually using the exchange rate
    from the today(which is differeent than the exchange rate at the
    time of receipt)  to calcuate the currency line cost.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of Purchasing with Foreign currencies with changing    *
    * exchange rates                                               *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * FOREIGN CURRENCY RECEIPT IS RETURNED THE CURRENCY LINE COST  *
    * OFTHE RECEIPT AND RETURN DOESN'T MATCH                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * None                                                         *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR is contained in the following maintenance
    package:
    	 IFIX 7.1.1.13 of Base Services
    

Temporary fix

Comments

APAR Information

  • APAR number

    IV69796

  • Reported component name

    PURCHASING

  • Reported component ID

    5724R46PU

  • Reported release

    711

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-02-23

  • Closed date

    2015-06-25

  • Last modified date

    2015-06-25

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • Maximo
    

Fix information

  • Fixed component name

    PURCHASING

  • Fixed component ID

    5724R46PU

Applicable component levels

  • R750 PSY

       UP