IBM Support

IT44617: RESTORE HYPER-V VM FAILS WITH ERROR ANS0324E PARTIALOBJLENGTH VALUE FOR PARTIAL OBJECT RETRIEVE IS INVALID.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as requirement.

Error description

  • Restore of a Hyper-V VM can be unsuccessful if the VM's disk was
    reduced in size without running an incremental-forever full
    (-mode=iffull) backup after the size reduction.
    
    The problem can occur if the VM disk was previously larger when
    it was backed up, then later the size was reduced without
    running a full backup of the VM after the size reduction. In
    such a case, restore of a backup version created after the size
    reduction is ends with the "ANS0324E partialObjLength value for
    partial object retrieve is invalid" message.
    
    Here is an example scenario:
    1. Data Protection for Hyper-V is used to back up a VM using the
    incremental-forever backup methodology (initial
    "incremental-forever full" followed by one or more
    "incremental-forever incremental" backups).
    
    2. The VM's disk is subsequently reduced in size.
    
    3. Data Protection for Hyper-V continues to run
    "incremental-forever incremental" backups of the VM.
    
    In this scenario, a restore of the VM might not succeed. During
    the restore operation, the following error is reported in
    dsmerror.log:
    ANS0324E partialObjLength value for partial object retrieve is
    invalid.
    ANS4311E Full VM restore of 'Hyper-V' Virtual Machine 'XXXXX'
    failed with RC=34 target node name='XXXXX', data mover node
    name='XXXXX'ANS4311E Full VM restore of 'Hyper-V' Virtual
    Machine 'XXXXX' failed with RC=34 target node name='XXXXX', data
    mover node name='XXXXX'
    

Local fix

Problem summary

Problem conclusion

Temporary fix

Comments

  • The issue has been fixed in IBM Storage Protect backup-archive
    client versions 8.2.0
    

APAR Information

  • APAR number

    IT44617

  • Reported component name

    TSM VE DP MS HY

  • Reported component ID

    5725TVEHV

  • Reported release

    81W

  • Status

    CLOSED REQ

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-09-27

  • Closed date

    2025-12-31

  • Last modified date

    2025-12-31

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SS8TDQ","label":"Tivoli Storage Manager for Virtual Environmen= ts"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"81W","Line of Business":{"code":"LOB69","label":"Storage TPS"}}]

Document Information

Modified date:
31 December 2025