IBM Support

IT42980: VM BACKUP UTILIZATION REPORT SIZES MISSING UNITS (MB, GB, TB, ...)

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • The IBM Spectrum Protect Plus VM Backup Utilization report
    displays the expected information except that units
    (MB, GB, TB, ...) are not displayed for the VM backup occupancy
    sizes.
    
    The sizes numbers are expressed in gigabytes.
    
    |MDVPARTL 5737SPLUS 10.1.12| IT42380
    
    IBM Spectrum Protect Plus Versions Affected:
    IBM Spectrum Protect Plus 10.1.13 and later
    
    Additional Keywords: SPP, SPPLUS, TS011815946, IT42380
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Protect Plus level 10.1.13                      *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See Error Description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply the fixing level when available. This problem is       *
    * currently projected to be fixed in IBM Spectrum Protect Plus *
    * level 10.1.14. Note that this is subject to change at the    *
    * discretion of IBM.                                           *
    ****************************************************************
    

Problem conclusion

  • The VM Backup Utilization report has been updated to include
    units (such as MB, GB, and TB) for the computed backup size
    values.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT42980

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A1C

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-01-26

  • Closed date

    2023-02-28

  • Last modified date

    2023-02-28

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • Platform
    

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A1C","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
17 May 2023