IBM Support

IT36598: PCOM 13.0.4 INSTALL-UPGRADE FAILED ERROR 1603

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • The user is having problem when "upgrading" their current PCOMM
    level going to PCOMM v13.0.4 level.
    
    The installation will fail
    with Error 1603.
    
    In the PCOMM install log file (pcsinst.log),
    this message is observed.
    
    "Maximum number of processes (150)
    reached. "
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All IBM Personal Communication users.                        *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * PCOM fails to upgrade if the number of running process is    *
    * more than 150.                                               *
    * This issue is due to a fixed number of processes allowed to  *
    * be stored into the array.                                    *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    1. Install PCOMM 12.0.4 version in the Windows-10 operating
    system.
    2. Launch PCOMM application with a few sessions.
    3. Make sure the system is running more than 150 process. (check
    in Task Manager).
    4. Try to upgrade with a higher version like 12.0.4 to 13.0.4.
    5. PCOMM upgrade fails and it will pop up some error message.
    6. Verify the failing scenario in the "pcsinst.log"
    

Problem conclusion

  • This issue is fixed with a dynamic number of processes stored
    into the array.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT36598

  • Reported component name

    PCOMM COMBO-ENG

  • Reported component ID

    5639I7000

  • Reported release

    D00

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-04-15

  • Closed date

    2021-08-13

  • Last modified date

    2021-08-13

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MSI
    

Fix information

  • Fixed component name

    PCOMM COMBO-ENG

  • Fixed component ID

    5639I7000

Applicable component levels

  • RD00 PSY

       UP

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSEQ5Y","label":"Personal Communications"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"D00","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]

Document Information

Modified date:
28 April 2022