IBM Support

IT34212: LOG BACKUPS DO NOT WORK WHEN EXCHANGE ADMINISTRATOR PASSWORD CONTAINS $

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • If log backup is enabled for Exchange database, by the first
    running of the SLA policy, the IBM Spectrum Protect Plus for
    Exchange agent try to create a Windows schedule task.  But when
    the Exchange administrator password contains $ character, it
    fails with message CTGGA2081 reported.
    
    The message looks like "Failed to create a task for log backup
    in Windows Task Scheduler.  Failed to enable log backup for
    spdb.1 or there were some considerable errors. For more
    information  see the diagnostic logs for this operation."
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Specturm Protect Plus level 10.1.6                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See error description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixing level when available. This problem is currently *
    * projected to be fixed in IBM Spectrum Protect Plus 10.1.7.   *
    * Note that this is subject to change at the discretion of     *
    * IBM.                                                         *
    ****************************************************************
    

Problem conclusion

  • When Exchange administrator password contains "$", the enable
    log backup operation fails with CTGGA2081, "Failed to create a
    task for log backup in Windows Task Scheduler. ". To fix this
    "$" need to be escaped.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT34212

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A13

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-09-15

  • Closed date

    2020-09-21

  • Last modified date

    2020-09-21

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A13","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
31 January 2024