APAR status
Closed as documentation error.
Error description
In Spectrum Control, the SVC subsystem port zero buffer credit value is received directly from the SVC storage device and has certain limitations in terms of what traffic it measures. For example, Spectrum Control customers may notice a difference between the switch port metric value & the SVC port metric value, as SVC is unable to measure the raw traffic through the ports as some of it is hidden by the Emulex hardware.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Control 5.2.x users monitoring SVC storage * **************************************************************** * PROBLEM DESCRIPTION: * * Spectrum Control customers may notice a difference between * * the switch port metric value and the SVC port metric value. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
This discrepancy is expected as the SVC storage device has certain limitations in terms of what traffic it measures. This is documented in the Limitations and known issues for IBM Spectrum Control: http://www-01.ibm.com/support/docview.wss?uid=swg21986557
Temporary fix
Comments
APAR Information
APAR number
IT21955
Reported component name
TPC
Reported component ID
5608TPC00
Reported release
52B
Status
CLOSED DOC
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-08-09
Closed date
2017-08-18
Last modified date
2018-05-22
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU029","label":"Software"},"Product":{"code":"SSNE44","label":"Tivoli Storage Productivity Center"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"52B"}]
Document Information
Modified date:
24 June 2022