APAR status
Closed as program error.
Error description
Error Description IBM STERLING B2B INTEGATOR V5.2.5 There's an errors in Crypto Message Service (CMS) when the you parse emails that are signed and encrypted. The error message in Advance Status is "Processing failed: The MIME header is missing in the inbound SMIME message."
Local fix
STRRTC - 528048 DW / DW Circumvention: None
Problem summary
USERS AFFECTED: ALL PROBLEM DESCRIPTION: Crypto Message Service (CMS) cannot parse the email when it is signed and encrypted due to the large MIME header size. PLATFORMS AFFECTED: ALL
Problem conclusion
RESOLUTION SUMMARY: A code fix is provided. As part of addressing this issue, we have created two new BPML parameters for the Crypto Message Service. 1. pipeSize - Size of the pipe (in bytes) created for carrying out the pipeline activities. Defaults to a value of 4096. Optional. Allowed values - any valid non-negative integer values NOTE :- 1. The pipeSize value should always be greater than the bufferSize value. 2. This parameter shall be used only when dealing with large MIME headers where the header size is > 1024 bytes. 2. bufferSize - Size of the buffer(in bytes) to hold the incoming data. Defaults to a value of 1024. Optional. Allowed values - any valid non-negative integer values NOTE :- 1. The pipeSize value should always be greater than the bufferSize value. 2. This parameter shall be used only when dealing with large MIME headers where the header size is > 1024 bytes. DELIVERED IN: 5020500_16 5020601_8 5020603_3
Temporary fix
Comments
APAR Information
APAR number
IT19558
Reported component name
STR B2B INTEGRA
Reported component ID
5725D0600
Reported release
525
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-03-06
Closed date
2017-07-12
Last modified date
2017-11-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
STR B2B INTEGRA
Fixed component ID
5725D0600
Applicable component levels
R525 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.5","Edition":"","Line of Business":{"code":"LOB02","label":"AI Applications"}}]
Document Information
Modified date:
15 November 2017