A fix is available
APAR status
Closed as program error.
Error description
The response flow of a mediation is not built during preload and is instead built when the first message is processed by the mediation.
Local fix
Problem summary
**************************************************************** USERS AFFECTED: Users of Business Process Manager v8.5 who are making use of the preload WebSphere environment variable to load mediation flows at application startup. **************************************************************** PROBLEM DESCRIPTION: The preload feature is designed to build all parts of the mediation flow at application startup. However, it was discovered that the response flows of a mediation were not being built successfully during preload and were instead being built when the first message was processed by the mediation.
Problem conclusion
The code has been changed to build the response flow during preload as per design of the preload feature.
Temporary fix
Comments
APAR Information
APAR number
IT07546
Reported component name
WESB IN BPM
Reported component ID
AIMCMFC00
Reported release
855
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-03-06
Closed date
2015-03-25
Last modified date
2015-03-25
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WESB IN BPM
Fixed component ID
AIMCMFC00
Applicable component levels
R855 PSY
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSC2KE9","label":"Mediation"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"855","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
25 March 2015