IBM Support

IJ52920: A SIGSEGV/GPF EVENT RECEIVED WHILE GETTING EXTENDED NPE MESSAGE

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Error Message: Unhandled exception
    Type=Segmentation error
    .
    Stack Trace: getSendSlotsFromSignature(libj9vm29.so)
    getNPEMessage (libj9vm29.so)
    JVM_GetExtendedNPEMessage (libjvm.so)
    ffi_call_unix64(libj9vm29.so)
    ffi_call_int (libj9vm29.so)
    VM_BytecodeInterpreterCompressed3runEP10J9VMThread(libj9vm29.so)
    bytecodeLoopCompressed(libj9vm29.so)
    .
    

Local fix

  • Use JVM Option -XX:-ShowCodeDetailsInExceptionMessages to
    disable the feature that displays the details of a
    NullPointerException generated by a VM.
    

Problem summary

  • The problem was caused due to dereferencing a NULL value while
    getting NPE extended message.
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    IJ52920

  • Reported component name

    J9 COMMON CODE

  • Reported component ID

    620700127

  • Reported release

    290

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2024-10-25

  • Closed date

    2024-10-26

  • Last modified date

    2025-02-15

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    J9 COMMON CODE

  • Fixed component ID

    620700127

Applicable component levels

[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SSNVBF","label":"Runtimes for Java Technology"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}}]

Document Information

Modified date:
15 February 2025