APAR status
Closed as fixed if next.
Error description
When oplocks and file leasing are enabled in smbc, it may be possible for part of a file to not be copied, even though the copy operation itself does not return an error. This can occur if the SMB server returns an asynchronous STATUS_PENDING response to smbc during the file copy.
Local fix
Problem summary
Files copied to smb share will have less sizes than the original file, basically incomplete file copies to smb share might happen with files whose sizes are >40MB.
Problem conclusion
Temporary fix
Comments
This APAR is being closed FIN. This means that a solution to this APAR is expected to be delivered from IBM in a release (if any) to be available within the next 24 months.
APAR Information
APAR number
IJ52123
Reported component name
AIX V7.2
Reported component ID
5765CD200
Reported release
720
Status
CLOSED FIN
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2024-08-20
Closed date
2024-09-25
Last modified date
2024-09-25
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SG11S","label":"AIX 7.2 HIPERS- APARs and Fixes"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"720","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}}]
Document Information
Modified date:
25 September 2024