APAR status
Closed as program error.
Error description
MAXIMO ALLOWS REVISED RELEASE POS TO BE APPROVED WHEN TOTAL COST EXCEEDS THE MAAXIMUM RELEASE COST STEPS TO REPRODUCE: 1. Go to Purchase Contracts application and create a new Contract: a. Vendor: A0001 b. Maximum Release Amount: 2000000 2. Go to the Properties tab and make sure "Create Released?" is checked and "Can Exceed Amount?" is unchecked. 3. Save the record. 4. Under More Actions, click on Authorize Sites. 5. Authorize the BEDFORD site. 6. Change its status to APPR 7. Under More Actions, click on Create Release PO 8. Populate the PO number and click OK. 9. Open the PO created on the previous step. 10. Go to PO Lines and add a new row: a. Line: 1 b. Line Type: Material c. Unit Cost: 1280.00 d. Location: ADDR2001 11. Save record and leave it on WAPPR status. 12. Go back to Contract created on step 1. 13. Under More Actions, click on Revise PO. 14. Add a description and click OK. 15. Change the Maximum Release Amount to 1000 16. Save the record. 17. Under More Actions, click on View Release Costs. 18. Notice that the PO created on step 7 is visible here and the total cost is 1280. 19. Approve the Contract revision. 20. Open the PO created on step 7. 21. Change its status and try to approve it. RESULTS: PO is approved and no error is thrown. When checking the Release Costs once again on the Purchase Contract, it is possible to notice that the Amount Remaining is now is -280.00 EXPECTED RESULTS: PO should not be approved since the cost is greater than the Maximum Release Cost, and the following errors should be displayed: BMXAA3279E - Could not change PO XXX status to APPR. BMXAA3231E - The purchase order cannot be approved. The cost of the release PO exceeds the maximum amount of 1,280.00 for a single release by 280.00. REPORTED IN VERSION: IBM Maximo Asset Management 7.6.1.2
Local fix
Problem summary
**************************************************************** * PROBLEM DESCRIPTION: * * MAXIMO ALLOWS REVISED RELEASE POS TO BE APPROVED WHEN TOTAL * * COST EXCEEDS THE MAAXIMUM RELEASE COST * ****************************************************************
Problem conclusion
The fix for this APAR will be contained in a future release.
Temporary fix
Comments
APAR Information
APAR number
IJ46348
Reported component name
MAXIMO ASST MGM
Reported component ID
5724R46AM
Reported release
761
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2023-04-06
Closed date
2023-07-17
Last modified date
2023-07-17
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO ASST MGM
Fixed component ID
5724R46AM
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
17 July 2023