IJ40904: PERMIT NOTE DOES NOT GET CARRIED OVER FROM PM(NUC) TO WORK ORDER(NUC) UPON WO GENERATION FROM THE PM.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Problem Description:
    In the Preventive Maintenance(Nuc) application, while generating
    WOs from PM associated to Impact Plan, all the details are
    carried over from Impact Plans(Nuc) > Impact Plans(Nuc) >
    Permits section to WO Tracking(Nuc) > Impact Plans tab >
    Maintenance Impacts subtab > Permits section, except for the
    Permit Note field.
    
    STEPS TO REPRODUCE:
    
    1. Go to Job Plans(Nuc) application.
    
    2. Create and activate 2 Job Plans, JP10 and JP10-1, associated
    to Template Type "Permit".
    
    3. Go to Classifications application.
    
    4. Bring up Classification "PUMP".
    
    5. In Use With section, add both IPPERMIT and PERMIT, and save.
    
    6. Go to Impact Plans(Nuc) application.
    
    7. Create a new Impact Plan record and take note of its number.
    
    8. Go to Maintenance Impacts tab > Permits section, click on New
    Row button, enter the following info and save:
    Permit Type: HTWRK
    Permit Generation Mode: REQUEST
    Job Plan: JP10-1
    Location: ADDR2001
    Permit Note: Test Permit Note
    Classification: PUMP
    
    9. From More Actions menu, select Template Impact Plan Actions >
    Change Maintenance Status, and change Maintenance Impact status
    to Approved.
    
    10. From More Actions menu, select Template Impact Plan Actions
    > Change Operational Status, and change Operational Impact
    status to Approved.
    
    11. Go to Preventive Maintenance(Nuc) application.
    
    12. Create a new PM record against any valid Location.
    
    13. Go to Job Plans Sequence tab, click on New Row button, and
    enter the following info:
    . Job Plan: JP10
    . Sequence: 1
    . Select the option "Impact Plan Required?"
    . Select the option "Impact Plan Manually Selected?"
    
    Note:
    A question icon will appear next to "Impact Plan Manually
    Selected?" checkbox. Click on that question icon, then reply Yes
    to "If you activate the setting for manual selection of an
    impact plan, you must manually specify an impact plan for use
    with this job plan. If you do not specify an impact plan, the
    system will not generate a working impact plan during PM work
    order generation even if a suitable match is found. Do you want
    to continue?".
    
    14. In the Impact Plan field, click on Detail Menu > Select
    Value.
    
    15. From Select Value dialog, select the Impact Plan created
    above.
    
    16. Go to Frequency tab, set Frequency as 7 Days, and Estimated
    Next Due Date as today's date.
    
    17. Save PM and change the status to ACTIVE.
    
    18. Generate a Work Order and take note of its WO number.
    
    19. Go to Work Order Tracking(Nuc) application.
    
    20. Bring up the WO generated above.
    
    21. With the WO record on the screen, go to Impact Plans tab >
    Maintenance Impacts subtab > Permits section.
    
    22. In the Permits section, click on View Details.
    
    RESULTS:
    The Permit Note field is empty. This is the issue.
    
    EXPECTED RESULTS:
    Similar as the other fields, the Permit Note should be carried
    over from the Permits section of the Impact Plan associated to
    the PM.
    
    REPORTED IN VERSION:
    IBM Maximo for Nuclear Power 7.6.2.0
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All IBM Maximo for Nuclear Power users.                      *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Permit Note does not get carried over from Preventive        *
    * Maintenance (Nuc) to Work Order (Nuc) upon Work Order        *
    * generation from the PM.                                      *
    ****************************************************************
    

Problem conclusion

  • A change in the code was made to fix the issue.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ40904

  • Reported component name

    MAXIMO FOR NUCL

  • Reported component ID

    5724R5300

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2022-07-06

  • Closed date

    2022-07-07

  • Last modified date

    2022-09-08

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO FOR NUCL

  • Fixed component ID

    5724R5300

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLL8M","label":"Maximo for Nuclear Power"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"760","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
08 September 2022