IBM Support

IJ37344: VFC ADAPTER MAY LOG DMA AND ENOMEM ERROR DURING LPM

 

APAR status

  • Closed as program error.

Error description

  • During LPM operation, the client LPAR may log the
    following errors :
    Dec  2 09:15:38 fscsi6  T FCP_ERR12    Recovery operation
                                           failure; ENOMEM
    SENSE DATA
    0000 0020 0000 00AD 0000 000C 0202 0001 C050 ...
                             ^^^^
    Dec  2 09:15:38 fscsi6  T FCP_ERR6     Unknown error
                                           number: 000000B1
    SENSE DATA
    0000 0020 0000 00B1 0000 000C 0202 0301 C050 ...
    Dec  2 09:15:38 fcs6    T VFC4_ERR9    Memory Allocation
                                           Failure from
                                           system/DMA memory
    Detail Data
    Error Location
    Filename:vfc_tx.c  Error Number:VFC_ERR_LOC_D8
      Function:vfc_bld_admin_pend_q  Line:385  RC:C
    

Local fix

  • N/A
    

Problem summary

  • if we have larger number of FC target devices configured
    through single fcs port, then LPM may fail to configure some of
    these FC devices.
    

Problem conclusion

  • admin command
    number of admin command elements are incresed from 50 to 100
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ37344

  • Reported component name

    AIX V7.3

  • Reported component ID

    5765CD300

  • Reported release

    730

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Submitted date

    2022-01-25

  • Closed date

    2022-01-25

  • Last modified date

    2022-11-15

  • APAR is sysrouted FROM one or more of the following:

    IJ37257

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    AIX V7.3

  • Fixed component ID

    5765CD300

Applicable component levels

  • R730 PSY U890661

       UP22/11/14 I 1000

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SG11T"},"Platform":[{"code":"PF053","label":"Power Systems"}],"Version":"730","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}}]

Document Information

Modified date:
15 November 2022