IBM Support

IJ34814: PR.TOTALCOST IS CALCULATED INCORRECTLY WHEN THE USER CHANGES THE CURRENCYCODE AND UPDATES THE UNIT COST OF THE LINE ITEMS

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Problem description
    
    PR.TOTALCOST is calculated incorrectly when the user changes
    the CURRENCYCODE and updates the UNIT COST of the Line Items
    
    STEPS TO REPRODUCE:
    1. Open the Exchange Rate application and enter an exchange
    rate:
    a. Convert from Currency: GBP
    b. Convert to Currency: USD
    c. Exchange Rate: 1.6
    d. Active Date: a past date time
    e. Expiration Date: a future date time
    2. Open the Purchase Requisition application and click to add a
    new PR
    3. Fill in:
    a. Company: select a vendor
    b. Click on PR Lines tab
    c. Click New Row to add two PRLINES:
    i. Item e.g. 0-0514, with Unit Cost as 10, tax 0.60
    ii. Item e.g. 0G3582, Unit Cost 50, tax 3
    iii. Save the PR
    d. Click on PR tab and take a note of the Total Cost: 63.60
    4. Change the Currency to GBP ? the costs are recalculated in
    GBP
    5. Go to PR LINES tab. Delete Line#1 and Update the cost of
    Line#2:
    a. Unit Cost of line#2 to 50.
    b. Tax: 3
    c. Save
    
    UNEXPECTED RESULTS:
    1. Click on PR tab:
    2. Total Tax: 3.22 not 3
    3. Total Cost: 56.97 not 53
    
    
    REPORTED IN VERSION:
    Tivoli's process automation engine 7.6.1.2
    

Local fix

  • client needs a fix
    

Problem summary

  • ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * PR.TOTALCOST IS CALCULATED INCORRECTLY WHEN THE USER CHANGES *
    * THE CURRENCYCODE AND UPDATES THE UNIT COST OF THE LINE       *
    * ITEMS                                                        *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR is contained in the following maintenance
    package: release\fix pack for Release 8.x Product
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ34814

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-09-02

  • Closed date

    2022-12-06

  • Last modified date

    2022-12-06

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
06 December 2022