IJ33792: LOAD CHART OVERLOAD ISSUE WHEN TWO SHIFTS ARE CONSECUTIVE WITH NO BREAKS IN GSLP

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Problem: Once a Work Cross two Shifts it creates a middle Load
    that is wrong.
    
    Expected Result: The load should be split according to the Start
    and End time between both Shifts
    
    Steps to Reproduce:
    Define two shifts as:
    AM shift: 8AM to 1PM
    PM shift: 1PM to 6PM
    Define an interruptible  work order A with 1 task, duration of
    this task is 5h, task planned craft(say MECH)  is also 5h.
    Create a work list in GSLP with above shift and work order, load
    the "Scheduling Alternate Resources" for the craft as 1.
    
    Manually drag the the work order A starting from 8:45AM in the
    AM shift, which can lead A end of 1:45PM in PM shift.
    
    Problem: Once a Work Cross two Shifts it creates a middle Load
    that is wrong. (1:30)
    
    Expected Result: The load should be split according to the Start
    and End time between both Shifts - (4:15) at the first Shift and
    the rest (0:45) on the Second Shift.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Scheduler users                                              *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR is contained in the following
    maintenancepackage:
    Release 7.6.1.3 of Base Services
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ33792

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-07-16

  • Closed date

    2021-07-16

  • Last modified date

    2024-10-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
30 October 2024