IJ29401: GRAPHICAL WORK WEEK - MESSAGE THAT THE NUMBER OF RECORDS EXCEEDS THE LIMT STAYS EVEN WHEN NO LONGER TRUE

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • In the Graphical Work Week (GWW) application  the message
    "Total activities records for project PROJECTNAME exceeds the
    limit of records allowed to be created" is shown even after the
    "Include Work Orders Without Dates?" checkbox  is unchecked
    which would reduce the number of records to be less than the
    limit.
    
    NOTE:  To test this there must be more than 1000 work orders
    (WO) that can be used in GWW
    
    STEPS TO REPRODUCE
    1. Go to Graphical Work Week and create a new record, select a
    Calendar and  a Shift.
    2. Set the Start/End Date to a  time range  which has less than
    1000 WOs available (meaning that on save, GWW will not produce
    the message about the exceeding limit).
    3. Enable the checkbox "Include Work Orders Without Dates?" and
    wait a few seconds until the warning icon appears besides it.
    Click in the warning and click OK, then click in the Save
    button.
    4. Maximo will warn the user that the limit of records was
    exceeded, click OK.
    5. Uncheck the "Include Work Orders Without Dates?" checkbox
    and save the record.
    
    RESULTS:
    Maximo will show the message about the exceeding limit again.
    
    EXPECTED RESULTS:
    Maximo shouldn't show the message about the exceeding limit.
    
    REPORTED IN VERSION
    7.6.1.2
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * scheduler                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * In the Graphical Work Week (GWW) application  the message    *
    * "Total activities records for project PROJECTNAME exceeds    *
    * the                                                          *
    * limit of records allowed to be created" is shown even after  *
    * the                                                          *
    * "Include Work Orders Without Dates?" checkbox  is unchecked  *
    * which would reduce the number of records to be less than the *
    * limit.                                                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.3 of Base
    Services(Scheduler 768x)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ29401

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    768

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-11-19

  • Closed date

    2020-12-08

  • Last modified date

    2024-10-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"768","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
30 October 2024