IJ29031: GRAPHICAL WORK WEEK - LEFT CLICK IN THE ASSIGNMENT DESCRIPTION TO CHANGE WEEKS IS NOT REFRESHING THE RESOURCES VIEW

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • In the Graphical Work Week (GWW) application doing a left click
    in the Assignment Description to change the week displayed to
    the week where the Assignment occurs, is
    not refreshing the Resources View to show that same week.
    STEPS TO REPRODUCE:
    1. Go to Work Order Tracking and create WO01:
    - Schedule Start Date = Next Monday 7AM / Duration = 7
    2.  On Plans Tab create 4 tasks:
    --- Task 01 Schedule Start Date = Two weeks ahead Monday 7AM /
    Duration = 7.
    --- Task 02 Schedule Start Date = Three weeks ahead Monday 7AM
    / Duration = 7.
    --- Task 03 Schedule Start Date = Three weeks ahead Monday 7AM
    / Duration = 7.
    --- Task 04 Schedule Start Date = Three weeks ahead Monday 7AM
    / Duration = 7.
    3. Create 5 Planned Labor lines:
    --- Task = null, Craft = AF (or any craft that has
    calendar/shift) then select a Skill Level (If AF, select SENIOR)
    --- Task = 01, Craft = AF (or any craft that has
    calendar/shift) then select a Skill Level (If AF, select JUNIOR)
    --- Task = 02, Craft = AF (or any craft that has
    calendar/shift) then select a Skill Level (If AF, select JUNIOR)
    --- Task = 03, Craft = CARP.
    --- Task = 04, Craft = CARP.
    4. Save the record.
    5.Go to Graphical Work Week, create GWW01, select a valid
    calendar, shift and set the start and end dates to include
    all of the weeks of the tasks above.  Then create a work query
    with Where Condition (parent = 'WO01' OR wonum = 'WO01').
    6. Move to the Graphical View tab and you will notice that the
    Assignments View shows the work available for current week.
    7. Left click the description of any assignment that is not
    being shown in the Gantt in the top section of the
    Graphical View tab.
    RESULTS:
    When using the description left click to zoom to the week of an
    assignment, GWW doesn't refresh the bottom view, the resources
    load and availability chart.  The top section goes to the week
    of the assignment but the bottom view stays unchanged.
    EXPECTED RESULTS:
     The Graphical View should be refreshed to show both
    assignments and
    load/availability for the same week, the week when the
    assignment happens.
    REPORTED IN VERSION:
    7612
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Work Week application in Scheduler    *
    * 7.6.8.                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * LEFT CLICK IN THE ASSIGNMENT DESCRIPTION TO CHANGE WEEKS IS  *
    * NOT REFRESHING THE RESOURCES VIEW.                           *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been made.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ29031

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    768

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-10-29

  • Closed date

    2020-11-04

  • Last modified date

    2020-11-04

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"768"}]