Error description

  • In the Graphical Scheduling (GS) application the
    Operational/Maintenance Calendars of different Assets/Locations
    are combined on the Graphical View tab.
    STEPS TO REPRODUCE:
    1. Go to the Locations application and create two locations:
     - LOCATION1
      - - Type: OPERATING
      - - Status: ACTIVE
      - - The other settings are default.
     - LOCATION2
      - - Type: OPERATING
      - - Status: ACTIVE
      - - The other settings are default.
    2. Go to the Assets application and create two assets:
     - ASSET1
      - - Location: LOCATION1 -  - Use Move/Modify Assets to select
    LOCATION1
      - - Status: ACTIVE
      - - Create a Maintenance schedule for the Asset:
      - - - Click on Define Maintenance Schedule on More Actions
    menu
      - - - Click on New Row in the bottom Asset Maintenance
    Periods section
      - - - Enter 2020/11/03 8:00 in Schedule Start
      - - - Enter 72 in Maintenance Hours
      - - - Click OK
      - - Create a Operational schedule for the Asset:
      - - - Click on Define Operational schedule
    2020/11/24 8:00   2020/11/27 8:00
     - - - Click on New Row in the bottom Asset Maintenance
    Periods section
      - - - Enter 2020/11/24 8:00 in Schedule Start
      - - - Enter 72 in Operational Hours
      - - - Click OK
     - ASSET2
      - - Location: LOCATION2 - Use Move/Modify Assets to select
    LOCATION2
      - - Status: ACTIVE
      - - Create a maintenance schedule starting at
    2020/11/16 8:00 and going for 96 hours.
    3. Go to Work Order Tracking and create two work orders:
     - WO1
      - - Location: LOCATION1
      - - Asset: ASSET1
      - - Scheduled Start: 2020/11/10 10:00
      - - Scheduled Finish: 2020/11/12 18:00
     - WO2
      - - Location: LOCATION2
      - - Asset: ASSET2
      - - Scheduled Start: 2020/11/16 13:00
      - - Scheduled Finish: 2020/11/18 12:00
    4. Go to Graphical Scheduling and create a new schedule
     - Change the Schedule  Type to be Asset (not Work)
     - Adjust the End date to be the end of November
     - Create an asset data source query to select the Assets
    created above.
     - On the More Information tab, check the Show Maintenance and
    Operational Schedules? check-box.
     - Open the Graphical View
    RESULTS:
    The Operational/Maintenance Calendar of different
    Assets/Location are combined on the Graphical View.
    The row for the first WO1 shows no Operational (white) or
    Maintenance (gray) periods.
    The row for WO2 shows all of the Operational and Maintenance
    periods combined.
    EXPECTED RESULT:
    Each of the assets has their own Operational and Maintenance
    periods defined and they should be visible on the Gantt chart
    on the Graphical View tab on their separate rows.
    REPORTED IN VERSION:
     7.6.1.2-IFIX20200921
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * scheduler                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * In the Graphical Scheduling (GS) application the             *
    * Operational/Maintenance Calendars of different               *
    * Assets/Locations                                             *
    * are combined on the Graphical View tab.                      *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
       | release\fix pack\interim fix for  Release 7.6.1.3 of Base
    Services(Scheduler 768x)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ28612

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    768

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-10-07

  • Closed date

    2020-10-08

  • Last modified date

    2020-10-09

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"768"}]

Document Information

Modified date:
10 October 2020