IJ28583: GRAPHICAL SCHEDULING - THE IN-LINE EDITING VALUES ARE NOT USED BY OPTIMIZATION.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • In both the Graphical Scheduling (GS) and Graphical Scheduling
    Large
    Project (GSLP), the in-line editing values are not able to be
    used by Optimization.
    Once the user edits a value on a Scenario level, such as the
    Target dates, Interruptible, or any available editable fields
    on the scenario, those changes are not be passed on to
    Optimization and get reset once the result comes back from
    Optimization.
    REQUIRED SETUP:
    - Have a set of Work Order records with Planned Labor
    - Have a Calendar and Shift created
    - Have the Optimization service configured into the system
    STEPS TO REPRODUCE:
    1. Go to Graphical Scheduling (or Graphical Scheduling Large
    Projects) and open a Schedule that loads the work orders
    described by the Required Setup above.
    2. Check the Scenario check-box on the More information tab and
    Change the status to Approved.
    3. Create a new Scenario and open the Graphical View tab.
    4. On the Graphical View tab, use the in-line editing to edit
    some of the available Columns, such as  Interruptible or Target
    dates.
    5. Run Optimization.
    RESULTS:
    Once the user edits a value on a scenario level, like the target
    dates, Interruptible, or any available editable fields on the
    Scenario, those fields will not be passed on to Optimization
    and get reset to their original values once the result comes
    back from Optimization.
    EXPECTED RESULT:
    The new values created by the in-line editing on the Scenario
    should be considered for Optimization, instead the values get
    reset with the default status of the records at the Work Order
    object.
    REPORTED IN VERSION:
    7.6.1.2-IFIX20200921
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * scheduler optimization                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * n both the Graphical Scheduling (GS) and Graphical           *
    * Scheduling                                                   *
    * Large                                                        *
    * Project (GSLP), the in-line editing values are not able to   *
    * be                                                           *
    * used by Optimization.                                        *
    * Once the user edits a value on a Scenario level, such as the *
    * Target dates, Interruptible, or any available editable       *
    * fields                                                       *
    * on the scenario, those changes are not be passed on to       *
    * Optimization and get reset once the result comes back from   *
    * Optimization.                                                *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  •   Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.3 of Base
    Services(Scheduler 768x)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ28583

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    768

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-10-06

  • Closed date

    2020-10-07

  • Last modified date

    2024-10-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"768","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
30 October 2024