APAR status
Closed as program error.
Error description
Temp Lifts: Temp Lift does not move to COMP status Description: Temp Lift should move automatically from REAPPLY to COMP when all tag actions are completed Maxvars: Automatically share tags during Shift Supervisor approval Use CL Groups = Yes Tag Seq Num Unique = No Allow IV changed on DRAFT status = Yes Set to Automatically transfer tags prior to operations approval APPR to READY manually when all tagging actions are complete Multiple CL for a WO = Yes Test Tags: Prevent Multiple Tags = T Caution Tags: compatible with Danger, Test, Grounding, and No tags. Steps to Reproduce: 1. Create Clearance 2001A, CL Group A, with tags on TEST_E1 and TEST_E2, and related WO 2201. Promote to ACTIVE, status. 2. Revise CL 2001A, add a tag on TEST_E3, and promote Rev 1 READY status. Issue Revised Clearance. Promote CL 2001A Rev 1 to ACTIVE status. 3. Create Clearance 2002, CL Group A, with a tag on TEST_E2, and related WO 2202. Promote the clearance to APPR status, and SHARE the tag on TEST_E2. Promote CL 2002 to ACTIVE status. 4. Create CL 2003, CL Group B, with a tag on TEST_E2, and related WO 2203. Promote CL 1003 to ACTIVE status. Tag on TEST_E2 does not share since it is in a different CL Group. 5.1 (CL 2001A Rev 1 in ACTIVE, CL 2002 in ACTIVE, CL 2003 in ACTIVE); CL 2001A Rev 1 TL 10 in DRAFT above, Location TEST_E2 below. 5.1 5.1 On CL 2001A Rev 1, create TL 10. Select the Shared tag 1036 on TEST_E2 for LIFT. Add a TEST tag 1039 on TEST_E2. Click the Link Affected Clearances button, and the SHARED tag 1036 on CL 2002 is selected, as well as the independent tag 1038 on CL 2001 is selected. Click OK. 5.2 Promote TL 10 to WAPPR status. Do not interrupt work. Navigate to WOs 2201, 2202, and 2203, Sign Off Labor on all the WOs. Perform Accept Boundary Revision on all WOs. 5.3 Bypass the problem by Releasing the WOs from the CLs and TL 10 by signing Work Complete on WOs 2201, 2202, and 2203. 5.4 Promote TL 10 to APPR. 5.5 Promote tags 1036 and 1038 to TEMPLIFT status, then promote tag 1039 to TEMPADD status. 5.6 Promote TL 10 to READY. 5.7 Promote TL 10 to REAPPLY status. No tagging activities performed yet. 5.8 On CL 2001A Rev 1 TL 10 in REAPPLY above, open the Temp Lift Tagging Activities dialog. Take shared tag 1036 from TEMPLIFT to APPLIED and Test tag 1039 from TEMPADD to RESTORED. Click OK and close the Tagging Activities dialog. 5.9 On TL 10 in REAPPLY status, reopen the Tagging Activities dialog and take tag 1038 from TEMPLIFT to RESTORED. TL 10 should move automatically from REAPPLY to COMP when the tag action is completed, however stays in REAPPLY. Expected Result: TL 10 should move automatically from REAPPLY to COMP when the tag action is completed.
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: * * All user from Maximo for Nuclear Power * **************************************************************** * PROBLEM DESCRIPTION: * * TEMP LIFT DOES NOT MOVE TO COMP STATUS * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
a fix was provided.
Temporary fix
Comments
APAR Information
APAR number
IJ04115
Reported component name
MAXIMO FOR NUCL
Reported component ID
5724R5300
Reported release
761
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-02-14
Closed date
2018-03-07
Last modified date
2024-10-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO FOR NUCL
Fixed component ID
5724R5300
Applicable component levels
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSLL8M","label":"Maximo for Nuclear Power"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
30 October 2024