Error description
Synchronize of a CCP Link does not work, but status is flaged as OK . Problem: Between the two CATParts a CCP Link was builed. After a modification of the reference the Copy was not synchronized, but the status of the external reference was still flaged as OK. . Scenario: 1. Start CATIA V5 2. Load the both attached CATParts (File-Open). . Result... You find in the CATPart called "05_001__Kasten_unten__1234567__A__1__ A.CATPart" a Solid called Solid.84. As you see in Edits/links, this solid is connected with a CCP link to the body "Tragwangen_GT01_Anguss_Id58452" of "Ref_Tragwangen_Id58452.CATPart". Note, that the Symbol (in the specification tree) is shown as synchronized and no Update is required. . 3. Make again an additonal CCP Link of the Body "Tragwangen_GT01_Anguss_Id58452" (thtough the publication) of the CATPart "Ref_Tragwangen_Id58452.CATPart". . Result... You see, that the new copy has a different position. The position of the new copy is right. .
Local fix
Problem summary
PART : SYNCHRONIZATION OF A CCP LINK DOES NOT WORK WHEREAS THE STATUS IS SET TO OK Synchronize of a CCP Link does not work, but status is flaged as OK . Problem: Between the two CATParts a CCP Link was builed. After a modification of the reference the Copy was not synchronized, but the status of the external reference was still flaged as OK. . Scenario: 1. Start CATIA V5 2. Load the both attached CATParts (File-Open). . Result... You find in the CATPart called "05_001__Kasten_unten__1234567__A__1__ A.CATPart" a Solid called Solid.84. As you see in Edits/links, this solid is connected with a CCP link to the body "Tragwangen_GT01_Anguss_Id58452" of "Ref_Tragwangen_Id58452.CATPart". Note, that the Symbol (in the specification tree) is shown as synchronized and no Update is required. . 3. Make again an additonal CCP Link of the Body "Tragwangen_GT01_Anguss_Id58452" (thtough the publication) of the CATPart "Ref_Tragwangen_Id58452.CATPart". . Result... You see, that the new copy has a different position. The position of the new copy is right. .
Problem conclusion
THIS PROBLEM IS PERMANENT RESTRICTION IN CATIA . Incident Diagnosis CCP Link (which is a link created after a Copy/Paste as result with link) is OK whereas geometry (here the position in the 3D space) is not the same between 2 parts. . Restriction Explanation R&D can not fix the root cause because they need a scenario (provided by the user) that could explain the way data has been corrupted. . By-Pass The bypass is to sham a modification in the reference Part to force the synchronisation of the link. To do so : 0. Open the two CATParts 1. In tools/options/Part infrastructure/general tab, set the update to manual mode (that will let you see which modification impacts the 3D position of the reference part) 2. Go on reference part 3. Edit one of its Part feature or GSD feature (e.g. the first feature of the first geometrical set) 4. In definiton pannel, change one of its parameter 5. Come back to the former value 6. Click OK 7. An update is required in reference part, then update the part 8. Go to the destination part 9. An update is also required. The link becomes correctly synchronised after the update. The position in 3D space is now right. .
Temporary fix
Comments
APAR Information
APAR number
HD58543
Reported component name
CATIA V5 NT>XP
Reported component ID
569151000
Reported release
517
Status
CLOSED PRS
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2006-10-30
Closed date
2006-11-17
Last modified date
2006-11-17
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSVJ2K","label":"CATIA V5"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"517","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
17 November 2006