IBM Support

Shuttle removal and installation - IBM eServer xSeries 250, Netfinity 7600

Troubleshooting


Problem

Instructions for removing the shuttle

Resolving The Problem

shuutle removal

Removing the shuttle

WARNING: The presence of ac standby power might result in damage to the hardware unless you disconnect the power cord for each power supply from the electrical outlet.

  1. Power-off the server.
  2. Disconnect the power cord for each power supply from the electrical outlet.
  3. Remove the top cover
  4. Disconnect the shuttle
  5. Place one hand on the handle at the front portion of the shuttle, and place the other hand on the ledge at the rear of the shuttle.
  6. Lift the shuttle at an angle with the rear of the shuttle being removed first and remove the shuttle from the server.

 

Document Location

Worldwide

Operating System

Older System x:Operating system independent / None

[{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"HW18R","label":"Older System x->xSeries 250"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}},{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"HWN15","label":"Older System x->Netfinity 7600"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
23 January 2019

UID

ibm1MIGR-45418