Upgrade on Linux nodes
Use these tables to access documentation for IBM Spectrum Scale upgrade on Linux nodes.
Upgrade task | Documentation |
---|---|
1 Go through the IBM Spectrum Scale product overview to understand the available features including support for protocols. |
|
2 Review the planning considerations for IBM Spectrum Scale including protocols. |
|
3 Review the hardware requirements, software requirements, and additional prerequisites including those for protocols. |
For the latest prerequisites information including supported Linux distributions and minimum kernel level, see the IBM Spectrum Scale FAQ on IBM® Knowledge Center. |
Upgrade task | Documentation |
---|---|
1 Understand the available upgrade options and supported upgrade
paths, and choose one of the two upgrade options.
|
|
2 Review considerations for upgrade including coexistence considerations and compatibility considerations. |
|
Recommended If you are using the installation toolkit for the upgrade, run the upgrade precheck procedure. Important: It is highly recommended to run the upgrade precheck procedure when you are
preparing for upgrade. This allows you adequate time to address any issues that are flagged in the
upgrade precheck.
|
Upgrade task | Documentation |
---|---|
1 Upgrade core GPFS using one of these procedures depending on your source and target version. |
|
2 Upgrade protocols. |
|
3 Upgrade performance monitoring. |
|
4 Upgrade management GUI. |
|
5 Upgrade call home. |
|
6 Upgrade file audit logging. |
|
7 Upgrade Cloud services. |
|
8 Complete the upgrade. |
|
Optional Revert to the previous level, if needed. |
|
Optional Change the product edition, if needed. |
Upgrade task | Documentation |
---|---|
1 Ensure that preparatory tasks for using the installation toolkit are complete. |
|
2 Review the considerations for doing upgrade with the installation toolkit. |
|
3 Run the upgrade precheck procedure and address any issues that are flagged. |
|
4 Perform online upgrade. |
|
5 Complete the upgrade. |
|
Optional Perform offline upgrade. |
|
Optional Rerun upgrade after an upgrade failure. |
|
Optional Upgrade IBM Spectrum Scale on IBM Spectrum Archive Enterprise Edition (EE) nodes. |