Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
Manual restart z/OS MVS Planning: Global Resource Serialization SA23-1389-00 |
|
The operator actions assume a fully-connected four-system complex. Assume that SYS1 failed and that SYS2 detected the failure. Assume also that GRSCNFxx specified RESTART(NO) and REJOIN(NO) for all systems. On SYS2, the following messages appear:
|
Copyright IBM Corporation 1990, 2014
|