z/OS MVS Planning: Global Resource Serialization
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF


Installing a new complex

z/OS MVS Planning: Global Resource Serialization
SA23-1389-00

How you actually install the global resource serialization complex depends — like every other decision related to global resource serialization — on the needs of your installation. Here are some installation considerations:
  • Identify the resources that you must include in the RNLs to get benefits from the complex as quickly as possible.
  • Define the long-term resource processing goals for your installation.
  • Evaluate the data set naming conventions at your installation and begin making any changes required to make better use of global resource serialization.
  • Evaluate the possibility of modifying existing applications to use global resource serialization more effectively.
  • Determine how global resource serialization will affect the design of future applications.
  • Prepare the initial educational and procedural material for the system operators.
  • Leave the RESERVE conversion RNL empty if you plan to continue using RESERVE/DEQ for data set serialization until the complex matches the sysplex.
  • Complete any shared DASD changes required to ensure that the complex does not share DASD volumes with systems outside the complex.

Go to the previous page Go to the next page




Copyright IBM Corporation 1990, 2014