z/OS ISPF Planning and Customizing
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF


Variables that control option panel redisplay

z/OS ISPF Planning and Customizing
GC19-3623-00

After an option has been processed, the Batch Selection panel with Job Step Generated is normally displayed, thereby allowing you to add another job step to the one just generated. It is possible, however, to link options together automatically by using the shared variable ZNEXTPN. The program ISRJB2 sets ZNEXTPN to blank. After the completion of a option CLIST, ISRJB2 references the variable again to determine the next panel to display. If you wish, for example, to display the linkage edit panel (ISRJP07) after processing the FORTRAN panel (ISRJP03), set ZNEXTPN to ISRJP07 either in the )PROC section of the FORTRAN panel or in the FORTRAN CLIST (ISRJC03), and place the variable in the shared pool. You can extend this type of panel linkage to any length you want.

Go to the previous page Go to the next page




Copyright IBM Corporation 1990, 2014