Scheduling charts

GDDM-PGF V2R1.3 Interactive Chart Utility
SC33-0328-01



Stacked bar charts with their first data group not shown (both on panel 1.4) and their x axis set to vertical (panel 5.2) are best for scheduling.


   PICTURE 225           

Figure 225. Stacked bar charts


Enter data in the form shown below: the first data group can be set to the starting date (week 3) and the second to the duration of the job (6 weeks):


   PICTURE 226           

Figure 226. Data Entry panel for stacked bar charts


Or use sample data 7 in panel 0.1.