You can create at most two schedules that cause the crawler to run without manual
intervention.
Procedure
-
On the Schedules tab, click Schedule 1 or
Schedule 2, and then click Enabled.
-
Specify the schedule type, start date and time, update interval, and then click
Save.
You can select one of three types of update interval.
- Fixed interval
- The crawler is run on a fixed schedule. For example, every 12 hours.
- Specific time on certain days in each week
- The crawler is run at the same times each week. For example, every Monday at 1:00am.
- Specific time on certain dates in each month
- The crawler is run at the same times each month. For example, every 5th of the month at
1:00am.