Installing the 8005-12N system
Learn about how to install, cable, and set up your 8005-12N system.
This section describes, at a high level, the tasks you must perform when you install and configure your 8005-12N system.
To install and configure your system, complete the following high-level tasks:
- Install the system into your rack.
- Connect your network cables. To connect your system to the network, complete the following
tasks:
- Identify the IPMI port on the rear of the system and connect a cable from this port into your network.
- Identify at least any two other network ports. These nodes have 4x 10GbE RJ45 ports and 4x 10GbE SFP+ to choose from. They will all be logically grouped together, within Nutanix AHV.
- Plug your cables into the appropriate switch, making sure that the ports are all in the same logical network segment.
- Connect the power cables to the power supplies and to the power source.
- Power on. Note: You can power on the nodes in any order.
- Attach the workstation and create clusters.
For more detailed instructions about how to perform these tasks, see the following topics: