POWER7 information

B1818C11   

Explanation

The netv daemon was unable to open the FSI device to get the side ID that is used to determine which bulk power controller (BPC) the daemon was running on.

Response

If this is a tracking event, no service actions are required. Otherwise, use the FRU and procedure callouts detailed with the SRC to determine service actions.


Send feedback Rate this page

Last updated: Tue, April 25, 2017