-WF

Displays an estimated finish time for running or pending jobs. For done or exited jobs, displays the actual finish time.

Categories

format

Synopsis

bjobs -WF

Output

The output for the -WF, -WL, and -WP options are in the following format:

hours:minutes status

where status is one of the following:

  • X: The real run time has exceeded the estimated run time configured in the application profile (RUNTIME parameter in lsb.applications) or at the job level (bsub -We option).
  • L: A run limit exists but the job does not have an estimated run time.
  • E: An estimated run time exists and has not been exceeded.